PWA Missing Tasks?

Right after I published my project to the Project Server (PWA), i logged in to the website url and true enough, I could see that there are now 4 tasks assigned to the user I logged in as. See picture below:

Now, the problem is, when i clicked on the hyperlink, i am taken to the My Task window, but there was not task showing! See picture below.

I searched on the internet, and nothing came up, which meant generally, that either, people didnt get this problem, or there was a simple solution for this. I then decided to check the settings of my ‘view’.

And by unselecting the “Show current tasks only’, i was able to ‘resurrect’ my tasks! Hope this window below will help all PMI professionals having the same issue as I did!